The third (and last scheduled) temporary closure the MBTA Green Line Riverside (D) branch will end two days earlier than scheduled! The line will be down October 22-28 between Kenmore and Riverside stations. Shuttle buses will again run along the route (except for Beaconsfield), and parking lots at Waban and Eliot stations will not be available. These closures enable the MBTA to replace track and install the Green Line Train Protection System (GLTPS) as part of its Green Line Transformation.